Closed Thread
Results 1 to 2 of 2

Thread: hi 1st post

  1. #1
    tapevad Guest

    Default hi 1st post

    i am building a inground pool here in spain and need advice in next steps, i have built walls with concrete blocks with re-bars inside vertical and horizontal i have also built the steps (but have been told that they need ripping out )so that the base can be laid with concrete then re-bars before gunite is sprayed then construct steps is this necersery ?.

  2. #2
    PoolDoc's Avatar
    PoolDoc is offline Administrator Quark Inspector PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars
    Join Date
    Jan 2005
    Location
    Georgia
    Posts
    11,207

    Default Re: hi 1st post

    Please note: original poster is asking about pool building in Spain

    Hi Tape;

    I doubt anyone here can answer your question. Pool chemistry is universal, but pool chemicals are not, so it's often hard to answer pool chemistry questions from other countries: we don't know what's available.

    Pool construction is even worse. Codes (legal requirements), equipment, available contractor skills are ALL very different from what's available in the US -- not necessarily worse -- just different.

    This means that advice that might be perfectly good here, is bad advice for you, there in Spain.

    Sincerely,

    Ben

Closed Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts