I would suggest (and it'll be more hand work) that you provide for drainage of the buried side to try to keep the bottom rail (it's steel?) from sitting at the bottom of a muddy hole. Also, I'd use landscape fabric between your aggregate fill and the excavated soil (above your drain tile) and backfill as the water rises - you don't want the backfill collapsing your wall.


Reply With Quote