Results 1 to 4 of 4

Thread: How do I build the new pipe system?

Threaded View

  1. #1
    adl6009 Guest

    Red face How do I build the new pipe system?

    The heat pump is on the way. I also ordered a new pentair multiport and a pentair rainbow chlorine feeder. Now all I have to do is put it all together. Any tips, tricks or, even more important, any "don't do this" stories would be appreciated. The only special consideration I have is I have limited space to install the heat pump. My filter is alongside my house and there is a chimney that is also in the way.

    -----------------------
    Ch filter pipes

    pump

    That is kinda they way it is. The dotted line is the house, the ch is the chimney. Pipes is where the pipes are. I am going to have to have a 90 degree turn from the filter to the pump and another 90 degree turn from the pump to the feeder and return to pool pipe. I was thinking of using the flexable pipe to reduce the sharpness of the turns. Any thoughts on this?
    Thank you.

    _Please note- the position of the heat pump is directly opposite the filter. The BB moves the word pump to the margin when it displays the post.
    Last edited by adl6009; 06-04-2006 at 12:41 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts