-
Question About AG Install
I have a pool contractor installing a 24' AG pool. It rained about a total of 6" over a three day period through Sunday and the ground was completely saturated. Our soil is mostly sand and small rocks. Today, Tuesday the contractor wants to install the pool but the ground is still not dried out.
My question is, does the ground need to completely dry out before attempting the installation or is it ok to lay down the new sand layer and put up the pool?
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules