-
Re: Subcontracting your own pool project?
We recently did our 1st pool (12K gallon IG) and I have a friend of a friend that retired from the pool business . He encouraged me to be my own GC and sub everything out. The savings was not enough (was about 10%) in order for me to deal with it. I am a mechanical engineer and I am sure it is rocket science but like the other guy said, I dunno diddly squat about good verse bad subs etc. Plus I would think that as a one time only customer I would not get as good service compared to most subs who do lots of work for pool guys, so schedule would be longer . Plus, I had no idea what the details and quality control requirements are, dug hole looks like a hole to me and have no idea what is required , so I would pay they guy after he made a hole, the the shot shell, same deal, what if down the line the plaster guy said"this shell is worthless" and I paid the shell guy and he was long gone...that sorta of risk was a HUGE downside. All that added up I bit the bullet and paid a pool guy to do it and I am happy with that decision for me.
Last edited by mneal; 06-15-2006 at 11:12 AM.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules