-
Re: pool quote
Check on multiple handling during excavation. Here they charge if they can't get the truck next to the excavator. What the charge is for dirty load ( large roots etc.). The charge for bringing dirt back or removing excess during back fill. Extra decking and retaining wall if needed. Gas piping to heater was extra also. Some of the things I and others have ran into that drives the price up.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules