Results 1 to 4 of 4

Thread: Installation Has Begun!

Threaded View

  1. #1
    Join Date
    Jul 2006
    Location
    Arkansas
    Posts
    146

    Talking Installation Has Begun!

    Hole was dug and walls, steps and spa were set yesterday. Then it rained last night- yuk. Today, PC installed coping, braced steps and spa ( spa is much like the steps that are installed with the liner pool -except its a semi-circle shape.) He also poured concrete around the bottom of the braces today, and started spreading the mountains of dirt into low places on our property. He spread about half of it. We are doing the wiring and he will do the plumbing.

    School has started and I am back teaching. So, it is really hectic here. We're gone all day and come home to look at the progress. I am taking pictures, but don't have time to post any. Hopefully, in a few weeks ( after parent/teacher conferences), I'll have time to post some pictures.
    Last edited by webfeet; 08-23-2006 at 06:58 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts