+ Reply to Thread
Results 1 to 10 of 48

Thread: Divnkd101 Pool Build

Hybrid View

  1. #1
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Divnkd101 Pool Build

    OK, it is Saturday. 10 days in since beginning. Tile and Coping (flagstone) are finished. The plumbers started late on Thursday and finished up last night. I was awakened this morning by a truck pulling into my back yard. The electricians are here. All the equipment is on the pad. Gas line has been run to the meter (inspection on Monday). Oh, I also got all the conduit run (with help of my 7 year old boy) for my speakers on the back side of the pool. Here are a few pics. I don't want to get in the guys way. Once they finish, I will upload more.






  2. #2
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    206

    Default Re: Divnkd101 Pool Build

    Moving right along and looking good.
    Site owner -- www.troublefreepool.com

  3. #3
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Divnkd101 Pool Build

    It has been a few days since my last post. The weather has been in our favor since the start of construction. We are now 25 days into our adventure. All trenches from plumbing/ electrical were filled. Rebar and decking is now complete. The cool deck (Desert Sand) will go on Monday. Plaster is scheduled for Wednesday and Thursday. Here are the pics from the decking. What do you think???






  4. #4
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: Divnkd101 Pool Build

    Very nice! On the home stretch...
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  5. #5
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    206

    Default Re: Divnkd101 Pool Build

    Looks nice.

    We are at almost exactly the same point in our build. I think I'm looking forward to getting my yard back, even more than swimming. lol

    We are scheduled to have the stacked stone on the backside of our spa done tomorrow - couldn't be done until the deck was in. I will get an update from the pb tomorrow on the rest of our timeline - sounds like you may make it to the finish line first.
    Site owner -- www.troublefreepool.com

  6. #6
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    206

    Default Re: Divnkd101 Pool Build

    So, did they do the Cool Deck today?
    Site owner -- www.troublefreepool.com

  7. #7
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Divnkd101 Pool Build

    Cool Deck is down and looking good. I think the color my wife and I picked really brings out the color of our brick and shows the contrast between the deck and flagstone. My wife has the natural knack of putting colors together to get them to match. She really did a great job. Here are the pics. What do you think??



    Last edited by divnkd101; 10-09-2006 at 09:29 PM.