+ Reply to Thread
Results 1 to 10 of 63

Thread: eljefe281's (Jeff's) pool project

Hybrid View

  1. #1
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  2. #2
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project





    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  3. #3
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    206

    Default Re: eljefe281's (Jeff's) pool project

    I don't know how I missed this post. It turned out great. I like the simple geometric shape; it's a nice clean look. Enjoy!
    Site owner -- www.troublefreepool.com

  4. #4
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    Thanks, Sean. I'm pleased with the way it turned out.

    And, like the B family, we heated the pool over the Thanksgiving weekend. At one point, we had 13 people in that tiny pool. It was a blast.

    It's a strange feeling when the pool water is warmer than the surrounding air.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  5. #5
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: eljefe281's (Jeff's) pool project

    Your pool came ot real nice!

  6. #6
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    Thanks! I appreciate the thought.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  7. #7
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: eljefe281's (Jeff's) pool project

    Jeff,

    What did you use for the plaster finish?

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts