Results 1 to 10 of 46

Thread: AL's Pool Project 10-17-06

Threaded View

  1. #17
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: AL's Pool Project 10-17-06

    Mt cocrete guy was able to finish the coping and fire pit this week.


    The pool equipmet is in. 2-2hp and 1-1.5 hp Whisper Flo pumps, Salt system.
    Monday they will start the tile and flagstone.
    Last edited by No Need; 12-16-2006 at 05:19 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts