+ Reply to Thread
Results 1 to 10 of 46

Thread: AL's Pool Project 10-17-06

Hybrid View

  1. #1
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: AL's Pool Project 10-17-06

    The stone work is finally done. Calling in for pre plaster inspection for Tuesday. Here is the latest.
    Last edited by No Need; 02-01-2007 at 11:11 PM.

  2. #2
    ehorn is offline Registered+ Thread Analyst ehorn 0
    Join Date
    Dec 2004
    Location
    Tucson, AZ, USA.
    Posts
    60

    Default Re: AL's Pool Project 10-17-06

    Looking good there. I like the stone work, I'm sure you are eagerly looking forward to finishing the pool. Good luck with the pre plaster inspection!

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts