    Just had mine done-

    collar was poured , vermiculite bottom and liner all done in the same day.
    inspections 2 days later!

  2. #2
    Waterworks is offline In the pool biz Thread Analyst Waterworks 0
    Join Date
    Dec 1969
    Location
    .
    Posts
    90

    Default Re: Construction Sequence?

    We just did the collar and pool bottom at the same time on a pool this afternoon. We normally do the collar first, then the bottom immediately afterward, but it doesn't make much of a difference. The only problem is if you aren't careful pouring your collar, the walls can move and disturb the bottom. As long as you are careful pouring the collar, there should be no problems.