+ Reply to Thread
Results 1 to 10 of 58

Thread: Steve's pool build status - Work started 2/19/2007!

Hybrid View

  1. #1
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Steve,
    Looks great. Nice selction of earth tones for waterline, etc. Great idea to add a natural stone step to help you get into the spa. Curious, did they round the flagstone edges on the coping? I had the choice of rounding or not rounding. I chose to round and really like the turnout. No sharp edges while you are in the pool. Keep the pics coming.

  2. #2
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by divnkd101 View Post
    Steve,
    Looks great. Nice selction of earth tones for waterline, etc. Great idea to add a natural stone step to help you get into the spa. Curious, did they round the flagstone edges on the coping? I had the choice of rounding or not rounding. I chose to round and really like the turnout. No sharp edges while you are in the pool. Keep the pics coming.
    Yea I had the choice as well. They are doing a chipped edge which is not too rough. I think that look was better for our pool. I figured I could always grind down the edge to make it rounded if it turned out to be too rough but chipping the edge would be harder so that is why I went that way. Thanks!

    Steve

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts