+ Reply to Thread
Results 1 to 2 of 2

Thread: Week 2

  1. #1
    steveinaz is offline Lifetime Member Weir Watcher steveinaz 2 stars steveinaz 2 stars
    Join Date
    Aug 2006
    Location
    Southern Arizona
    Posts
    210

    Thumbs up Week 2

    Week 2 of the new pool and things are going well. The BBB method/Best guess chart is simple and effective. My numbers are looking better as well:

    Water temp: 63
    FC: 7.5
    CC: 0
    PH: 7.6
    CYA: 55 (Up from 25)
    TA: 170 (Down from 210)
    CH: 220 (Up from 200)

    To maintain these numbers, I add 4 cups of Clorox, and 2 cups of muriatic acid daily. Water has remained crystal clear. About 20 more days and the SWCG will be fired up.

    For the bean counters, this comes to approx $15/month for Clorox (7.5 gallons). Approx $10/month in muriatic acid, though this is dropping in use as alkalinity drops.

    I really pleased with the in-floor cleaning system---I was skeptical about what it would do, but it works very well.
    Last edited by steveinaz; 03-19-2007 at 11:28 AM.

  2. #2
    steveinaz is offline Lifetime Member Weir Watcher steveinaz 2 stars steveinaz 2 stars
    Join Date
    Aug 2006
    Location
    Southern Arizona
    Posts
    210

    Default Re: Week 2

    Looks like my PH may be stabilizing, the last 3 days it's held at 7.6 with no muriatic needed.

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts