+ Reply to Thread
Results 1 to 10 of 14

Thread: Concrete Patching Question

Hybrid View

  1. #1
    Join Date
    May 2010
    Location
    2264 century point lane
    Posts
    4

    Default Re: Concrete Patching Question

    Use a 4 1/2 inch grinder with a smooth diamond blade the chip free one.
    Cut a shoulder about 1 inch deep all around. Make that round hole a square
    cut some lines about 1 inch apart parallel with the edge of that square kinda like slicing the inside of that square in 1 inch slices.
    Make sure that all these cuts are about the same depth
    To do that you can spray paint your blade, the side that you see when you cut
    and let it dry a bit and then when you make the first cut the paint will
    be removed by the concrete and voila you have a depth marker.
    Next time you cut you will see how deep you have to go with the grinder running.
    After you done cutting hit the slices perpendicular with hammer and chisel
    or a chipping hammer.
    They will come out easy and will leave you a nice same depth hole
    Then fill with hydraulic cement if wet or other pool rated cement if dry
    hope this helps

  2. #2
    Join Date
    May 2010
    Posts
    10

    Default Re: Concrete Patching Question

    Thanks cbucner, that is a great help!!
    When I look at the instructions for Hydraulic cement they say:
    "only mix what you can use in about 3 minutes"
    Should I be able to fill a 12' x12" square 1"deep in 3 minutes??

    Also Shoud I use a bonding agent between old and new?

    In the past I have used the bonding agent instead of water to mix the cement...

  3. #3
    waste is offline PF Support Team Whizbang Spinner waste 3 stars waste 3 stars waste 3 stars
    Join Date
    Dec 1969
    Location
    S.E Maine
    Posts
    1,753

    Default Re: Concrete Patching Question

    Depends on how fast you can mix the stuff and how well you trowel.

    I'm a little pressed for time tonight, but will answer more fully tomorrow, if you need.
    Luv & Luk, Ted

    Having done construction and service for 4 pool companies in 4 states starting in 1988, what I know about pools could fill a couple of books - what I don't know could fill libraries

  4. #4
    Join Date
    May 2010
    Posts
    10

    Default Re: Concrete Patching Question

    Thanks . any help/suggestions would be apreciated....

  5. #5
    waste is offline PF Support Team Whizbang Spinner waste 3 stars waste 3 stars waste 3 stars
    Join Date
    Dec 1969
    Location
    S.E Maine
    Posts
    1,753

    Smile Re: Concrete Patching Question

    See what time I'm logging on? - This time of year = LONG work days

    I can mix the stuff in ~ 1 minute (experience allows me to know the water to dry ratio and I use a 'margin' trowel to mix - real time savers) so have ~ the full 3 minutes to apply and trowel the stuff smooth. Folks mixing for the first time tend to take a couple+ minutes to get the mix to the correct consistency, which means it's got to be troweled smooth more quickly.

    If you need a primer on troweling techniques, ask - but it will take me a few days to be able to provide that sort of detailed info - but someone else may help in the meantime.

    (had you asked this question in Feb, when I was laid off - I'd have spent hours giving the details - maybe you should open your pool earlier LOL)
    Luv & Luk, Ted

    Having done construction and service for 4 pool companies in 4 states starting in 1988, what I know about pools could fill a couple of books - what I don't know could fill libraries

  6. #6
    Join Date
    May 2010
    Posts
    10

    Default Re: Concrete Patching Question

    Thanks Ted I really appreciate the time you are taking to help me

    I won't be starting this project for a week or so and I am sure that any info. or tips on techniques that you can give me would help tremendously !!
    I will keep checking to see if you have had any spare time but please
    post only when you have the time...
    Thanks again
    Robert.

  7. #7
    Join Date
    May 2010
    Posts
    10

    Default Re: Concrete Patching Question

    So If my patch is 1 inch deep and about 12' x12" square,
    how long does the patch need to cure before I paint over it?
    Do I need to acid wash or etch before I paint??

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts