-
Re: Baquacil to Chlorine Conversion Procedure
Day 7: Pool is still crystal clear. Total bleach so far = 56 gals 6%. Pump pressure holding steady. Backwashed yesterday, before adding 3 lbs CYA to reduce chlorine loss.
FC dropped 3.2 ppm, and CC dropped .5 ppm overnight. Should I contine to add bleach in large quantities? It will probably be 2 weeks until I can change the sand.
Here are the overnight readings:
Tue 8pm
7.2 ppm FC
1.0 ppm CC
7.2 pH
200 TA
Wed 7am
4.0 ppm FC
0.5 ppm CC
7.2 pH
0 CYA
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
Forum Rules