If you put in 33 drops, then your chlorine is actually 16.5 (if you used the 10 mL sample). You divide by 2, instead of multiplying by 2. I would add CYA to around 40-50 ppm, but otherwise your numbers don't look too bad. If it's a concrete pool, then your calcium needs to be 200-400 ppm, but you didn't list that. If it's too low, then the water will leach the calcium out of your concrete finish and make it brittle.

Reply With Quote
Bookmarks