And . . . that is why we NEVER trust pool store (or pool guy) results! Getting the CYA wrong by 400% is not 'close'!
OK. 5K gallon pool (15' x 3.8' water depth); PF=24. 1 gallon of PLAIN 8.25% bleach adds about 17 ppm of chlorine to your pool. (24*0.7 lbs /gal = ~17)
1. Start dosing each EVENING with 1 full gallon of plain bleach.
2. The following evening, test with OTO. If the result is clear to light yellow, add 1 more gallon. If DARK yellow, 1/2 gallon. If ORANGE, skip that dose.
3. Continue dosing in this manner for 2 days AFTER there's no trace of slipperiness or algae remaining.
4. Starting the 2nd night, BRUSH the pool completely every 2 days.
5. When you reach your final bleach dose (per #3 above), test 1 hour after dosing using the FAS DPD test. Test for BOTH FC and CC. Test AGAIN the following AM, before full sun hits the pool. Report those results here.


Reply With Quote