Added a jug of bleach and did a quick test with the wal-mart kit after I stirred it up.
.5 ppm chlorine
7.8 pH
I'll finish filling the pool tonight and run a full battery of tests with the Taylor Kit. The plus side is that our tap water reads .5 ppm of chlorine out of the tap, so as we add water, we're adding a decent amount of chlorine (or so it seems).
Should I try to get the chlorine to shock level off the start, or should I just keep it at recommended levels until CC is over .5 ppm? I was planning on trying to get it between 1 and 3 ppm before bed tonight and checking it again in the morning.

Reply With Quote

